Reverted revision(s) 5412 because the validation of the Dike embankment material in DAM Engine is incorrect, so problem must be solved in DAM EngineRelated to Issue [MWDAM-2164]
Slice results in cross section are updated in time.For Bishop/UpliftVan, slice results for Uplift are now written in rsxml file.Related to Issue [MWDAM-2452]
Expected results updated with new calculated results due to position of waternet line of PL1 (moved 1 mm upwards when coinciding with other waternet line)Related to Issue [MWDAM-2242]