Index: DamEngine/branches/DamEngine 19.3/doc/Dam Engine - Functional Design/UseStabKernel.tex =================================================================== diff -u -r3736 -r3737 --- DamEngine/branches/DamEngine 19.3/doc/Dam Engine - Functional Design/UseStabKernel.tex (.../DamEngine 19.3 wrong/doc/Dam Engine - Functional Design/UseStabKernel.tex) (revision 3736) +++ DamEngine/branches/DamEngine 19.3/doc/Dam Engine - Functional Design/UseStabKernel.tex (.../DamEngine 19.3/doc/Dam Engine - Functional Design/UseStabKernel.tex) (revision 3737) @@ -44,20 +44,28 @@ Ad 2 Client defined generation\newline The client defines the dimensions; number of gridpoints and distance between the points. The \ProgramName defines the position of the grid depending on the characteristic points: -For Bishop and for the active grid of LiftVan the left (outside) bottom corner is situated at the surfaceline in the middle of the crest (distance between outer- and innercrest). The right bottom corner of the passive grid of LiftVan is situated above the most right x co-ordinate where uplift occurs. With the restriction that the left bottom corner can not be situated left of the x co-ordinate of the DikeToePolder. +For Bishop and for the left grid of LiftVan the left (outside) bottom corner is situated at the surfaceline in the middle of the crest (distance between outer- and innercrest). The right bottom corner of the right (inside) grid of LiftVan is situated above the most right x co-ordinate where uplift occurs. With the restriction that the left bottom corner can not be situated left of the x co-ordinate of the DikeToePolder. \subsection{Tangent lines generation} \label{sec:TangentLinesGeneration} +For the models Bishop and LiftVan a tangent lines must be generated. -For the Bishop model only automatic generation is used.\newline -The tangent lines are placed from the minimum Z-value of the surface line until 0.5 m below the upper geometry point of the lowest aquifer. The distance between the tangent lines is 0.25 m. +There are two options: +\begin{enumerate} + \item automatic generation + \item client defined generation +\end{enumerate} -For LiftVan there are two client defined methods\newline -Distance defined - Naar opgave afstand\newline +Ad 1 Automatic generation\newline +Bishop\newline +-to described-\newline +Liftvan\newline +-to described-\newline + +Ad 2 Client defined\newline +For Bishop calcuations the tangent lines can not be defined by the client.\newline For LiftVan the client must provide the distance between the tangent lines. -The lower tangent line is always situated 0.5 m below the boundary of the upper aquifer. The tangent lines are drawn with the given distance until the minimum Z value of the passive grid.\newline -On boundary - Op laagscheidingen (default)\newline -On every boundary of the subsoil layer. +The lower tangentline is always situated 5.0 m below the upper geometry point of the lowest aquifer. The tangentlines are drawn with the given distance until the upper tangent line is situated above the Z DikeToeAtPolder. \subsection{Calculation area} \label{sec:CalculationArea}