Index: DamEngine/trunk/src/Deltares.DamEngine.Calculators/Properties/Resources.resx
===================================================================
diff -u -r6752 -r6851
--- DamEngine/trunk/src/Deltares.DamEngine.Calculators/Properties/Resources.resx (.../Resources.resx) (revision 6752)
+++ DamEngine/trunk/src/Deltares.DamEngine.Calculators/Properties/Resources.resx (.../Resources.resx) (revision 6851)
@@ -295,6 +295,9 @@
An unexpected error occurs during the determination of the intersection point between the ditch and PL 1.
+
+ The user-defined penetration zone partially overlaps or extends above the in-between aquifer. Therefore, PL 2 is set equal to PL 4.
+
An unexpected error occured during the determination of the top and bottom boundaries of the in-between aquifer layer.
@@ -305,9 +308,9 @@
Location {0} Profile {1} Scenario {2} is not relevant (different calculator or no uplift at using piping).
- Location {0} Profile {1} Scenario {2} is not calculated because there is no uplift at using stability UpliftVan.
-
+ Location {0} Profile {1} Scenario {2} is not calculated because there is no uplift at using stability UpliftVan.
+
- No uplift
-
+ No uplift
+
\ No newline at end of file