Index: DamEngine/trunk/doc/Dam Engine - Functional Design/UseStabKernel.tex =================================================================== diff -u -r2744 -r2745 --- DamEngine/trunk/doc/Dam Engine - Functional Design/UseStabKernel.tex (.../UseStabKernel.tex) (revision 2744) +++ DamEngine/trunk/doc/Dam Engine - Functional Design/UseStabKernel.tex (.../UseStabKernel.tex) (revision 2745) @@ -44,24 +44,21 @@ Ad 2 Client defined generation\newline The client defines the dimensions; number of gridpoints and distance between the points. The \ProgramName defines the position of the grid depending on the characteristic points: -For Bishop and for the left grid of LiftVan the left (outside) bottom corner is situated at the surfaceline in the middle of the crest (distance between outer- and innercrest). The right bottom corner of the right (inside) grid of LiftVan is situated above the most right x co-ordinate where uplift occurs. With the restriction that the left bottom corner can not be situated left of the x co-ordinate of the DikeToePolder. +For Bishop and for the active grid of LiftVan the left (outside) bottom corner is situated at the surfaceline in the middle of the crest (distance between outer- and innercrest). The right bottom corner of the passive grid of LiftVan is situated above the most right x co-ordinate where uplift occurs. With the restriction that the left bottom corner can not be situated left of the x co-ordinate of the DikeToePolder. \subsection{Tangent lines generation} \label{sec:TangentLinesGeneration} -For the models Bishop and LiftVan a tangent lines must be generated. - -Bishop: Automatic generation\newline +For the Bishop model only automatic generation is used.\newline The tangent lines are placed from the minimum Z-value of the surface line until 0.5 m below the upper geometry point of the lowest aquifer. The distance between the tangent lines is 0.25 m. -LiftVan: Client defined\newline -Distance defined - Naar opgave afstand +For LiftVan there are two client defined methods\newline +Distance defined - Naar opgave afstand\newline For LiftVan the client must provide the distance between the tangent lines. -The lower tangentline is always situated 0.5 m below the upper geometry point of the lowest aquifer. The tangent lines are drawn with the given distance until the upper tangent line is situated above the Z DikeToeAtPolder. +The lower tangent line is always situated 0.5 m below the boundary of the upper aquifer. The tangent lines are drawn with the given distance until the minimum Z value of the passive grid.\newline +On boundary - Op laagscheidingen (default)\newline +On every boundary of the subsoil layer. -On boundary - Op laagscheidingen -On every boundary of the subsoil layer below Z DikeToeAtPolder a tangent line is generated. - \subsection{Calculation area} \label{sec:CalculationArea} For the model Horizontal balance a calculation area must be defined: