Expected results updated with new calculated results due to position of waternet line of PL1 (moved 1 mm upwards when coinciding with other waternet line)Related to Issue [MWDAM-2242]
Waternet line for in-between aquifer changed into 2 lines instead of a close boundary to be correctly displayed in STIX file.Related to Issue [MWDAM-2242]
Added (failing and ignored) test for combining a soilProfile2D with a surfaceline cutting the top boundary of the soilProfile2DRelated to Issue [MWDAM-2132]
Added (failing and ignored) test for combining a soilProfile2D with a surfaceline fully below the top boundary of the soilProfile2DRelated to Issue [MWDAM-2132]
Added (failing and ignored) test for combining a soilProfile2D with a surfaceline fully above the top boundary of the soilProfile2DRelated to Issue [MWDAM-2132]