Checkout Tools
  • last updated a few seconds ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
Fixed for review

Related to Issue [MWDAM-1170]

  1. … 8 more files in changeset.
Removed dead code.

Related to Issue [MWDAM-1170]

Fixed compiler warnings

Related to Issue [MWDAM-1141]

  1. … 1 more file in changeset.
Added GetDesignStrategy to IKernelWrapper interface.

Implement in Kernel wrapper classes

Related to Issue [MWDAM-1141]

  1. … 7 more files in changeset.
Refactored. Prepare for adding new design strategy

Related to Issue [MWDAM-1141]

  1. … 1 more file in changeset.
Refactored. Split up in smaller classes.

Related to Issue [MWDAM-1141]

  1. … 3 more files in changeset.
Fixed unit tests

Related to Issue [MWDAM-1170]

  1. … 2 more files in changeset.
Removed DesignScenario from DamKernelInput

Related to Issue [MWDAM-1170]

  1. … 22 more files in changeset.
When DGeoStability calculation fails continue with other calculations

Related to Issue [MWDAM-1161]

  1. … 2 more files in changeset.
Adapted to review

Related to Issue [MWDAM-1095]

  1. … 13 more files in changeset.
Improve piping Bligh design test and fix bugs detected by them

Related to Issue [MWDAM-1095]

  1. … 2 more files in changeset.
Fix unit tests

Catch exception for each single design calculation

Related to Issue [MWDAM-1095]

  1. … 2 more files in changeset.
Working implementation of Design Piping Bligh (celanup to be done)

Related to Issue [MWDAM-1095]

  1. … 8 more files in changeset.
First working implementation of Design Piping Bligh (still a work in progress)

Related to Issue [MWDAM-1095]

  1. … 16 more files in changeset.
Add RiverLevelHigh and RiverLevelLow to DamKernelInput, because dependent on the type of analysis the source for these values can vary (e.g. designScenario.RiverLevel or Location.BoezemLevelHbp for RiverLevelHigh)

Related to Issue [MWDAM-1095]

  1. … 4 more files in changeset.
Added method to synchronize design data given scenario with the data in location (which is actually used).

Related to Issue [MWDAM-1057]

Added FullStiFileName to SoilGeometryProbability, besides existing StiFileName.

Changed WorkingDir in DamKernelInput to CalculationDir, added ProjectDir.

Related to Issue [MWDAM-1056]

  1. … 13 more files in changeset.
Replaced ProjectWorkingPath by ProjectPath and CalculationMap.

Related to Issue [MWDAM-1150]

  1. … 19 more files in changeset.
For now same code for adapt and noadapt geometry (to fix unit test in UI)

Related to Issue [MWDAM-1095]

Added work_in_progress test for Piping Bligh Design

Related to Issue [MWDAM-1095]

  1. … 3 more files in changeset.
Refactored code.

Fix typo in TD

Related to Issue [MWDAM-1095]

  1. … 2 more files in changeset.
Add SurfaceLineSlopeAdapter class

Related to Issue [MWDAM-1107]

  1. … 14 more files in changeset.